Home Design-Bid-Build Heckscher Drive Over Ft. George Inlet
Our Work

Heckscher Drive Over Ft. George Inlet

Project Highlights
  • 18-span bridge
  • 4,000 linear feet medium-level bridge
  • 14,200 linear feet of 72-inch Florida bulb tee girders
  • 15,000 linear of 30-inch prestressed concrete piling
  • 15,000 ton of rip rap
Client
Florida Department of Transportation (FDOT)
Location
Duval County, FL
Completion Date

April 2010

Industry
Delivery Methods
Design-Bid-Build