World Drive Extension

Our team provided vital improvements that alleviate congestion in a highly travelled area in Lake Buena Vista, FL. This corridor has thousands of travelers daily, in addition to local residents and businesses. The new road and bridge improvements increased the functionality and flow of traffic along the roadways, improved access to associated facilities and parking lots, and diverted through traffic around the highly congested area. Superior Construction was responsible for road and bridge construction, demolition, MSE wall, earth embankment, drainage construction, utility adjustments and construction, and lighting.

Project Highlights
  • 3 bridges
  • 5,541 linear feet of prestressed concrete girders
  • 3,200 cubic yards of structural concrete
  • 54,000 square feet of MSE retaining walls
  • 620,000 lbs of reinforcing steel
  • 251,000 cubic yards of excavation
  • 65,000 tons of asphalt
Client
Reedy Creek Improvement District
Location
Orange County, FL
Completion Date

2018

Industry
Delivery Methods
Design-Bid-Build