Client
Georgia Department of Transportation
Location
Columbia County, Georgia
Work Performed
This project replaces and widens the existing parallel I-20 bridges over the Augusta Canal and Savannah River, as well as widening and reconstructing portions of the I-20 roadway. Additional project components include dual left-turn lanes, a dedicated right-turn lane, roadway widening, a new traffic signal, and utility adjustments. Superior Construction is coordinating closely with both GDOT and SCDOT, as this project crosses state lines.
Completion Date
April 2025
Industry
Delivery Methods
Design-Build