Home Our Work
Our Work

What We Build

BP Whiting Refinery Coker Chute Replacement
Cecil Airport Expansion Apron
Bay Street Innovation Corridor
Wekiva Parkway Section 6
I-65 / I-70 North Split
Sanibel Causeway Emergency Repairs and Permanent Reconstruction
John T. Brooks Bridge Replacement
NAVFAC Building 350 Road Repairs and Drainage
I-4 / Daryl Carter Parkway Interchange
Summer Haven Beach Restoration
Suncoast Parkway II – SR 44 to CR 486
US-301 Concrete Test Road
I-20 Over the Savannah River
St. Augustine Bridge Rebuild & Track Raise
First Coast Expressway
SR 56 Diverging Diamond Interchange
NIPSCO Oakdale Dam Floodgates & Stoplogs Replacement
I-10 / US 301 Interchange
Jacksonville Regional Transportation Center Pedestrian Bridge
I-4 Direct Connect
Chicago Harbor Lock North Pier Stabilization
Coastline Drive & Liberty Street Bridge Replacement
Saturn Parkway Extension
Gary Chicago International Airport Runway Rehabilitation
BP Naphtha Hydroheater (NHT) Inside Battery Limit (ISBL)
US 35 Bridge Rehabilitation
NLMK Replace Furnace Charge Table
SR 9B Phase III
US 52 Over the Wabash River
World Drive Extension
BP Dissolved Nitrogen Flotation Unit
SR 9B Phase II
CR 209 Over Black Creek
Blount Island Marine Terminal (BIMT) Wharf Rehabilitation & Upgrades
Lake Michigan Lakefront Rehabilitation & Park Improvements
BP Whiting Refinery Expansion
Mathews Bridge Emergency Repair
ArcelorMittal 160-Inch Plate Mill Leveler
ArcelorMittal New Bascule Bridge
Beach Boulevard over the Intracoastal Waterway
I-95 Widening – Flagler County
SR 9A / SR 202 Interchange
Talleyrand Marine Terminal Crane Beam
Automated Skyway Express River Crossing
Atlantic Boulevard Over the Intracoastal Waterway
Big Carlos Pass Bridge
BNA Terminal Access Road Improvements
Heckscher Drive Over Ft. George Inlet
Ports of Indiana SR 249 Bridge Construction
TIA Blue Main Terminal Curbside Expansion
US 41 Over Harts Branch Trail
US Steel Corporation