Overview

This project improves connection between the Florida’s Turnpike and I-4 in Orlando. As part of the project, Superior Construction is building electronic tolling sites, operational improvements at the Consulate Dr southbound off-ramp, a direct connect fly-over ramp between the Turnpike and I-4, drainage improvements, and asphalt resurfacing on the Turnpike between Orange Blossom Tr and Vineland Rd. In total, the project includes four new toll sites, improvement to three ramps, and one direct connect flyover ramp approximately 1,900 feet long. When complete, this project will improve traffic operations and safety throughout the interchange.

  • Location Orange County, Florida
  • Owner Florida Department of Transportation
  • Delivery Method Design-Bid-Build
  • Completion Year In Process
  • Contract Value $84.7 million

Project Highlights

  • 1,900-ft flyover ramp
  • 14,903 feet of precast concrete beams
  • 277 precast concrete piles
  • 4.5 miles of asphalt resurfacing
  • 4 new toll sites
  • 3 ramps
  • 35 miles of asphalt milling & resurfacing