This design-build-finance project included the construction of approximately 2.5 miles of a new alignment, limited access highway from I-95 to US 1. Project features include a system-to-system interchange at I-95 and SR 9B and a fully directional interchange at US 1 and SR 9B. To accommodate future express lanes on I-95, the project also widened I-95 from six to eight lanes for approximately 2.75 miles. Additional infrastructure improvements included the full reconstruction of US 1 from four lanes to six for approximately two miles of extensive utility relocations.
Project Highlights
- 168,000 square yards of concrete placed
- 8 new bridges
- 4-lane limited access highway
- 220,000 square feet of sound barrier
- 2.5 miles of interstate widening
- ATC process delivered $10 million savings to FDOT
Client
Florida Department of Transportation
Location
Duval and St. Johns Counties, FL
Completion Date
2016
Industry
Delivery Methods
Design-Build
Project Awards
Award of Merit, 2016, Design-Build Institute of America